Monday, August 30, 2010

Gadget Hunting, Part2.

Aug 30, 2010.

I got both items from my friend who travelled back from Korea and China.
The thermo- hygrostat is very light and compact. It's functions do serve the purposes of bird house very well and the unit is very easy to operate. My friend also bought one to try on his mushroom culture. It works well too.

For the transducer, it also worked quite well.
It weighed around 7 kg, a heavy duty one!
In fact the transducer isn't that heavy but the transformer that come with it is real heavy.
Many thanks to my friend, SK, who helped hand carry it all the way back from China.

According to the manual, we need to keep the water level 60-80 mm. above the transducer all the time.
So my hubby made me a floater by using a piece of foam and 6 table tennis balls.

Floater

With the floater, we can place it in a tall tank without losing any mist producing efficiency.
Walla, it works very well and produce a lot of mist. You can see that the mist is very thick but it sit still covering up the transducer.

TallTank

Mists

Thus I put a fan beside this tank, the mist then came out continuously. See it in action!
It works very quiet too. We can only hear the sound of the water, no electrical motor humming sound.
The manufacture claimed that this unit also produce negative ions that can freshen the air.
I hope birds will likes this refreshen mist and air.



Next step is to fabricated into a close container with water level switch, a fan, and a PVC tube to release the mist into the bird house.

Saturday, August 21, 2010

Almost there

The latest picture taken yesterday.

Last Floor1

Last Floor2

The following pictures were taken 27 Aug 2010.

Open Roof

Palm trees on the left side of the building.

Palm tree

Rice paddy field infront, right side and behind the building.

Rice field

Very clear water under the building.

Clear Water

Sunday, August 15, 2010

Gadget Hunting

While I am awaiting for my bird house to be finished.
I am hunting for some gadgets to be used in my bird house.
Found two interesting ones:
1. A thermo-hygrostat, we can set the required temperature or humidity for a fan or humidifier to be turned on/off.
It's sensor can be extended to 30 meter. So that we can place this machine in the control room, no need to go inside the bird house to check the temperature and humidity.

Photobucket

2. An ultrasonic transducer for making very fine mist to increase room humidity. This one has an output of 6000 ml/ hour,
plenty of fog!

Photobucket

I did order each of them to try on.
It will need quite some times to know whether they are suitable to my bird house or not.

So slow

This is the latest picture of my bird house taken Aug14th, 2010.
I planned to open the bird house by mid October.
I am not quite sure it will be on time.

4th floor Coulmn

Drain holes on the outside wall.
Drainage outside wall

Ventilation holes for the hot air between two walls.
VH between walls

Tuesday, August 3, 2010

Cool Down Your Fog

I read that fog made by ultrasonic fogging machine actually increased the temperature in your bird house. This is because water or fog juice has to pass through a transducer that makes high frequency and heat as well.

Of course we do not like higher temperature in our bird house, beside if we can cool down our fog, it will make the fog look heavier and stay longer.

Don't believe me, see for yourself from this young man's video.
How are we going to adopt his idea into our bird house is another headache.

Thursday, June 3, 2010

Good News

I just came back from the second visit from Surat. We were there to check out the construction progress.
(First visit were during May3rd to May5th for the title deed transferred.)
We drove from Bangkok to Surat on May28th and backed on May30th.

During the past month from April15th to May28th, the construction were progressing slowly.
The contractor didn't give it a full attention due to their other commitment.
But they promised that from now on, we will have their full attention as their other sites have been completed.

During our trip, we inspected the quality of the contractor's work and were not very satisfied with the quality of their workmanships. We found many cracks on the cement floor and informed them to be more careful for the next time.
As my husband is a civil engineer by profession, he advised them on how it happened and how to prevent and correct these cracks.

Today,June 3rd, they will work on the first floor columns.

Good news we heard today is that, the road in front of our land is currently a very narrow and unpaved road.
But today, many contractors from local authorities came to the area to widen the road and next step is to pave the current dirt road into a cement road, wow!

We hope that our Bird House will be finished at about the same time as the cemented road.
That would be very nice, right?

Updated on Jun 13th,2010
The cement road have now completed, as a public project this was surprisingly fast!
My BH, a private project is still going so.... slowly.

BHRoadInfront

FFColumn2

FFColumn1

Rainy season is coming, there are now water in the pond. Thank God that we finished our first floor beam before the heavy down pour. Otherwise our beam would have strength problem as all the wooden supports were stood on the harden soil.

Jun 18th, the second floor beam.

Second floor Beam1

Second Floor Beam2

Updated by photo, Jun25th, second floor column. Water under the building looked clearer now.

เสาชั้นสอง2

เสาชั้นสอง1

Monday July 5th, third floor beam.
ThirdFloorBeam

Floor Drain
FloorDrain

The surroundings, the road in front.
นาเริ่มเขียว

July10th, third floor beam finished.Water under the building are very clear with nice greenish blue color.
Photobucket

Wall on first floor are now up. For certain reason, bricks are different on north and south side.
Photobucket

Jul17th, a very little progress, sigh! Not quite sure it will be finished by end of September or not.

Photobucket

Photobucket

July 23rd, third floor column, two weeks behind schedule!

Photobucket

Wednesday, May 26, 2010

Construction Progressed Well

The construction are progressing well. Luckily this year rainy season started a little late,
thus the contractor could finish the ground floor area before the rain came.

You can see that the surroundings still looked very dried.

Underground columns.
เสาตอม่อ

Ground floor beams.
คานคอดิน

First Floor Beam

Beam

Ground Floor Cement Plank Laying
Cement Floor Laying

Ground Floor