Tuesday, April 13, 2010

Piling started

Piling started since yesterday, April 12th, 2010!
We will use two 30 cm., 10m., piles per column.
The first pile was driven down by a piling machine up to 9.3 m. only.
So the data from the constructor are pretty accurate. He told  us earlier that
from his prior project nearby, the 10m. pile could not be driven down completely.
We trusted him and didn't do any soil testing!

So the first column will be erected on April 15th as planned.

I 've learnt to work on my design with Google Sketch-up program recently.
So many new things to be learnt in relation to this bird house project, beside the Sketch-up, I also learnt how to use the Audacity sound editing program to eliminate the unwanted noise/sound from the bird sounds we have had.

Below are my 2D pictures from the Sketch-up design,(in fact the program is a 3D one, but I don't think I can put it in 3d here).
Any comments are welcome.


The front of the building facing north.
FrontNorth

Inside
North InsideNew

Back of the building, south side.
BackSouth

Inside
South Inside New

East side
East

Inside
EastInsideNew

West side having double walls with stair cases in between the two walls.
West

ใส่ราวบันได

No comments:

Post a Comment