Tuesday, December 14, 2010

Micro of the unfinished house 2.

Micro Conditions at my BH Dec11-12,2010

House is almost finished, but there are still here and there to be completed. Doors and ventilation 90 degree angle fittings are not put on yet. Outer wall on the North side isn't finished, thus North side has only a single wall at the moment. But there seemed to be not much effect because during this season, the sun moves from East to West on the South side.

Still working on the outer wall of North side and just start working on the metal sheet roof.
Quiz: How many workers in this picture?
Almost Dec13,2010

Data were taken by taking photo from the thermo-hygrometer when ever I remembered, so some data were missing.

Dec 11th, 2010

Third Floor
Time .10.21 11.16 12.29 15.47 17.58
Temp . 25.6 26.4 27.2 29.2 27.6
Humidity . 84 82 79 74 76

Second Floor
Time . 10.16 11.16 12.28 15.47
Temp . 25.8 26.2 26.8 28.3
Humidity . 85 84 82 78

Ground Floor
Time .10.16 11.18 12.37 15.5
Temp . 25.5 26.2 26.9 28.3
Humidity . 89 87 82 81

Dec 12th, 2010

Third Floor
Time .9.36 12.03 13.58 15.32
Temp . 25.5 26.9 28.1 28.1
Humidity . 85 84 79 78

Second Floor
Time . 9.24 12.01 13.56 15.29 18.1
Temp . 25.9 27.2 28.2 27.9 27.1
Humidity . 85 84 80 83 84

Ground Floor
Time .9.2 12.04 13.56 15.29 18.32
Temp . 25.5 27.1 28 27.9 26.7
Humidity . 89 88 83 84 85

One thing looked good is that the temperature peaked around 4 pm and then started to decline. This is because the West side of this building has a very effective double wall which are 2 meter apart. So the hot ray could not get inside the building on the West side as easy as the other sides where double walls are only 20 cm. apart.

I've seen data from other's house of which West wall was not fully protected and poor ventilation , the temperature kept climbing up until 8 pm!